The Service Center in Hiep Phuoc anh Long Tho commune
esc_admin2023-09-30T10:08:26+07:00Overview
The service center with 51 hectares in area, located in Hiep Phuoc Town and Long Tho commune, Nhon Trach district, Dong Nai province. The project is located in the center of Nhon Trach Industrial Park (2,700 ha) under Nhon Trach new urban planning project. The project situates on Road 25C, the main route connecting Ho Chi Minh City with the Southern provinces, near seaports, air ports and major national routes.
The formation of this project will contribute to the construction of a modern and civilized urban, serving the demand of services for the development of industrial parks and residential areas in Nhon Trach district and the region.
The project is to provide high quality consumer products and services in a variety of areas, including commercial and service centers, financial centers, medical centers, training centers, sports, entertainment, hotel, restaurants … in line with the needs of customers inside and outside these Industrial Parks.
Contact Information
Tin Nghia Corporation
Address: 96 Ha Huy Giap street, Quyet Thang ward, Bien Hoa city, Dong Nai province
Tel: +84.613822486
Fax: +84.613823747
Email: info@tinnghiacorp.com.vn
Landway:
- 30km from Hochiminh city (Cat Lai ferry) .
- 45km. from Bien Hoa
- 65km from Vung Tau city.
Airway:
- 55km from Tan Son Nhat airport
- 10km from Long Thanh international airport (phase 1 to be operated in 2020)
Seaway:
- 25km from Cat Lai port.
- 18km from Go Dau port.
- 32km from Phu My port (to accomodate vessel of 56,000 tons).
- 37km from Cai Mep port.
- 66km from Vung Tau port.
Traffic system:
The local traffic system of project connected to the main roads and adjacent to Nhon Trach 3 Industrial Park
Power supply:
Supplied from the national grid of 22 KV
Water supply:
From Nhon Trach underground water plant: with capacity of 20,000m3/day & night.
Telecommunication:
- The telecommunication system is developed in the whole I.P. So business enterprises can register for connection conveniently.
- 4 Mbps high speed internet line
Wast water treament:
- Waste water treatment plant with the total capacity of 10,000m3 / day&night. (3 phases thereof have been developed with a total capacity of 7,000m3 / day & night).
- Waste water to be treated from factories involves industrial waste water, including living wastewater and production waste water.
- Standard level for effluent discharged into waste water system of the I.P.: according to QCVN 40:2011.